Item Qty Technical parameters
1.  Brewhouse
1.1 Mash tun/Kettle 1 Material: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 3 mm;

– Covering – 1 mm;

– Legs – ∅114х3;

– Thermal insulation (urethane plastic foam) – 120mm

– V net=2500l;

– V total= 3100l;

– Size:  Н=1823 mm , Ø=3461 mm.

Configuration:

– Rotary  cleaning ball G1ʺ

– Malt supply pipe

– Extract straight pipe;

– Manhole 6010 Е-1 pc.;

– Steam jacket: – bottom, walls;

– Motor reducer 2.2 kW, 30 rpm;

– Mixer, temperature sensor PT 100(1 pc.)

1.2 Lauter tun  1 Material: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 3 mm;

– Covering – 1 mm;

– Legs – ∅114х4;

– Thermal insulation (urethane plastic foam) – 120 mm;

– V net=2500l;

– V total= 3100l;

– P operational – 0 atm.;

– Size: 1823×3028 mm.

Configuration:

– Rotary  cleaning ball G1ʺ;

– Sieve;

– Extract straight pipe;

– Manhole 6010 Е-1 pc.;

– Steam jacket: – bottom, walls;

– Motor reducer 2.2 kW, 30 rpm;

– Temperature sensor PT 100(1 pc.)

– Rotary undersieve washing head G1ʺ;

– Manhole for unloading grains.

1.3 Whirlpool 1 Мaterial: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 3 mm;

– Covering – 1 mm;

– Legs – 114×3;

– thermal insulation (urethane plastic foam) – 120 mm;

– V net=2500l;

– V total= 3100 l;

– Size:  1823х3028 mm,

– P operational – 0 atm.;

– Operating temperature: +100°С ÷ +20°С.

Configuration :

– Rotary  cleaning ball 360°, 1”

– Temperature sensor PT 100(1 pc.);

– Manhole 6010 Е-1 pc.

1.4 Hot water tank  1 Мaterial: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 3 mm;

– Covering – 1 mm;

– Legs – 114×3;

– thermal insulation (urethane plastic foam) – 120 mm;

– V net=2500l;

– V total= 3100 l;

– Size:  1823х3028 mm,

– P operational – 0 atm.

Configuration :

–  Rotary  cleaning ball, G1ʺ;

–  Manhole 6010 Е-1 pc.;

–  Temperature sensor PT 100(1 pc.).

1.5 Malt Mill  1 P = 1200 kg /hour;

Two adjustable rollers.

1.6 Screw feeder 1 Malt Conveyor Q=24m3/hour.
1.7 Hops separator 1 Material: stainless steel AISI 304

– Size:  Н=800 mm, Ø=114 mm,

– The connecting sizes – DN65;

– The cell of the filter element – 0.5.

1.8 Wort aeration system 1 Oilfree  air compressor, microbiological filters system, Aeration unit DN32.
1.9 Pumps 7 1.Wort and Mash pumps: P = 1,1 kW, 380V, 2 pcs.;

2.Coolant pump: P = 0,75 kW, 380V, 2 pcs.;

3.Coolant pump: P = 1,5 kW, 380V, 1pc.;

4.Hot water pump: P = 1,5 kW, 380V, 1 pc.;

5.Ice water pump: Р = 0,55 kW, 380V,1 pc.

1.10 Control panel 1 Semiautomated, speed control of lauter tun’s ripper, frequency converter. 380V

Material: AISI 304

 

* optional equipment 15” touch screen control panel (automatic control of brewing processes, monitoring program with tips, taps on the harness are switched manually, material: AISI 304) – specify the price.

1.11 Service platform: maintenance of brewhouse 1 Material: steel AISI 304
1.12 Steam generator 2 Anode Electric Steam Generator:

–  Productivity – Q = 150 kg / h;

–  Power consumption: P = 0-105 kW 380V.

1.13 Piping system 1 Set of stop pipeline valves DN50

Material AISI304

2.   Refrigeration compartment
2.1 Refrigeration station 2 Thecumseh,  Productivity  25kW Р=15 kW 380V
2.2 Plate heat exchanger 2 Temperature range: +95°С ÷ +15°С;

Environment: beer wort, water;

2 sections;

Surface area – 1,35 м2

2.3 Glycol tank 2 Material: Steel AISI 304

Steel thickness:

– Inner cylinder – 3 mm;

– Outer cylinder – 1 mm;

– Thermal insulation (urethane plastic foam) –  100 mm;

–  Legs – 114×3;

–  P operational – 0 atm.

Configuration :

–  Sleeve supply of a coolant DN 32;

–  Sleeve extraction of a coolant DN 32.

3.  Fermentation and after-fermentation part
3.1 Conical Tank: spiral cooling

system, thermo-insulation

12 Material: Steel AISI 304

Dimensions:  1823х4028;

Vраб= 5,0 м3Vобщ= 6,0 м3

Steel thickness:

– Inner cylinder – 3 mm;

– Covering – 1 mm;

– External cone – 3 mm;

– Inner cone – 4 mm;

– Legs – Ø 114×4;

– Thermal insulation (urethane plastic foam) – 100 mm;

– P operational = 1,5-2 atm.

Configuration :

  • – Rotary cleaning ball G1ʺ;
  • – Manhole 6006 С (1 pc.);
  • – CIP DN 50;
  • – Bunging device;
  • – Temperature sensor pt 100(2 pcs.);
  • – Flexible level indicator;

– Dual-action  valves;

  • – Two cooling zone.
3.2 Control panel FV  

 

3 Semiautomated control, automated temperature control in fermentation tanks, temperature controller with PID controller Autonics, solenoid-operated valve ODE.
3.3 Beer piping system 2 Conical tanks coolant connection.
4.   Ancillary Technological Equipment
4.1 Ice water tank 1 Material: Steel AISI 304

Vnet.= 5,0 м3Vtot.= 6,0 м3

Steel thickness:

– Inner cylinder – 3 mm;

– Outer cylinder – 1 mm;

– Legs – Ø 114×3;

– Thermal insulation (urethane plastic foam) – 100 mm;

Dimension: 1823х3770;

– P operational = 1,5-2 atm.

Configuration :

  • – Rotary cleaning ball G1ʺ;

– Cooling jacket;

– Temperature sensor pt 100;

– Sleeve supply of a coolant DN 32;

– Sleeve extraction of a coolant DN 32.

4.2 Brewer set 1 Express analysis devices;

Scales, reagents, bucket, scraper;

Refractometer, alcohol thermometer, ladle;

Dropper (iodine), wrench, scraper;

Refractometer – 1 pc.; Alcohol thermometer – 1 pc.;

Dropper (iodine) – 1 pc.; Wrench,  scraper – 1 pc.

Sampling bucket – 1 pc.; Fitting for pumping wort DN25(32); Areometer  0-10%., Areometer 10-20% – 1 pc.

4.3 CIP- station 1 Material: Steel AISI 304

V=2* 10 hl

P=6.5 kW, 380V

Pump Calpeda MXH 804 Pump

4.4 Instalation set & Transporting constructions 1 Set of materials for transfer, installation and commissioning

Fill out the form below and today we will provide you with the calculation results for your brewery.

*Select volume to see available options
*Depends on the brewing volume
*Depends on the brewing volume
You can select multiple options
*Depends on the brewing volume
*Depends on the brewing volume
Total: 0,00 €
Want to get an offer for this calculation? Fill the required fields.

Submit an application

Leave a request and we will contact you


Terms of delivery: EXW

Time of delivery: 90 days

Installation time: 30 days

Launch period, four brews and training of personnel: 10 days

 

INSTALLATION

 Turn key installation (15 – 17% of the brewery price).

Installation is carried out by our company. All expenses are covered by the supplier. The final cost of installation may be calculated after receiving of detailed building plan and photo report (or after visit of our specialist to brewery installation site).

 

Simple Brew Company:

  • Reliable manufacturer of high quality brewing equipment;
  • Certificated materials of European manufacturers;
  • Full manual assembly, compulsory testing of equipment before shipment
  • Reasonable prices;
  • Individual approach to clients;
  • Experience over 16 years, 170 successfully completed projects around the World: Ukraine, Russia, CIS countries, European Union, North America, Asia.

 

Each brewery made by Simple Brew it’s a project designed according to your individual requirements and technical indicators. Buying a brewery you will get reliable equipment and additional services which allow you to launch a successful project even without brewing experience.

 

The process of cooperation:

  • Detailed calculation of a recoupment of your project;
  • Training of your personnel by our brewers;
  • Warranty and post-warranty service;
  • Recommendations about quality raw materials.

 

For more detailed information and miscalculation, please contact our specialist through the application form on the website 