Item Qty
Technical parameters
1. Brewhouse
1.1 Mash tun 1 Мaterial: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 4 mm;

– Covering – 1 mm;

– Legs – ∅114х4;

– thermal insulation (urethane plastic foam) – 125mm

– V net=5000l;

– V total= 7000l;

– Size:  Н=3800mm , Ø=2145 mm,

Configuration:

– Rotary  cleaning ball 360°

– Malt supply pipe

– Extract straight pipe;

– Manhole;

– Steam jacket: – bottom, walls;

– Motor reducer 4 kW, 380V;

– Mixer, temperature sensor

– “butterfly” valves

1.2 Kettle  1 Мaterial: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 4 mm;

– Covering – 1 mm;

– Legs – ∅114х4;

– thermal insulation (urethane plastic foam) – 125mm

– V net=5000l;

– V total= 7000l;

– Size:  Н=3800mm , Ø=2145 mm,

Configuration:

– Rotary  cleaning ball 360°

– Malt supply pipe

– Extract straight pipe;

– Manhole;

– Steam jacket: – bottom, walls;

– Motor reducer 4 kW, 380V;

– Mixer, temperature sensor,  “butterfly” valves

1.3 Lauter tun  1 Мaterial: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 4 mm;

– Covering – 1 mm;

– Legs – ∅114х4;

– thermal insulation (urethane plastic foam) – 125mm

– V net=5000l;

– V total= 7000l;

– Size:  Н=3800mm , Ø=2145 mm,

Configuration:

– Sieve; collapsible / sectional,

– Washing head;

– Undersieve washing head;

– Revision manhole;

– Manhole for unloading grains;

– Motor reducer 6 kW;

– Ripper, unloading

1.4 Whirlpool  1 Мaterial: stainless steel AISI 304

Steel thickness:

– Inner cylinder – 3 mm;

– Covering – 1 mm;

– Legs – 3 mm;

– thermal insulation (urethane plastic foam) – 100mm

– V net=5000l;

– V total= 7000 l;

– Size:  Н=3250mm , Ø=1350 mm,

– Operating temperature: +100°С ÷ +20°С,

Configuration :

– Rotary  cleaning ball 360°, 1”

– Air outlet valve;

– Manholes (2);

– Motor reducer 2.2 kW, 380V;

– Mixer

– “butterfly” valves

– waterjet cutted lauter tun screens

1.5 Hot water tank

  • intended to produce hot water for washing the pellet in lauter tun
1 Material: Steel AISI 304

Vtotal=10500l,

Electric heating elements P = 18 kW

Thermal insulation – 125mm

1.6 Malt Mill  1 P = 1200 kg /hour

Two adjustable rollers

1.7 Screw feeder 1 Malt Conveyor Q=24m3/hour
1.8 Hops separator 1 Material: stainless steel AISI 304

– Size:  Н=800mm , Ø=114 mm,

– The connecting sizes –DN65;

– The cell of the filter element – 0.5

1.9 Wort aeration system 1 Oilfree  air compressor, microbiological filters system, Aeration unit DN32
1.10 Pumps 9 1.Wort and Mash pumps P = 1,1 kW, 380V,   4 pcs.

2.Coolant pump, P = 0,75 kW, 380V, 2 pcs.

3. Coolant pump, P= 1,5 kW, 380V, 2pc.

4. Hot water pump, P= 1,kW, 380V, 1 pc.

1.11 Control panel 1 Semiautomated, speed control of lauter tun’s ripper,  frequency converter. 380V
1.12 Service platform: maintenance of brew house 1 Material: steel AISI 304
1.13 Steam generator 2 Gas steam generator

–  Q=1800 kg/steam/hour;

(specified by agreement with the client)

1.14 Piping system 1 Material: steel AISI 304,  DN65
2.  Refrigeration compartment
2.1 Refrigeration station 2 Productivity 2 х 50 kW   Р=2*25

Flow switch  – 2 pcs,

Р=15 kW, 380V, Freon R404

2.2 Plate heat exchanger  2 Temperature range: +95°С ÷ +15°С

Environment: beer wort, water

2 sections

Used for wort cooling before pumping into the CCT. The cooling process held in two stages – the first circuit is cooled by water, the second one with 40%  solution of propylene glycol.

2.3 Glycol tank 2 Material: Steel AISI 304 Steel thickness:

– Inner cylinder – 3 mm;

– Outer cylinder – 1 mm;

– Thermal insulation (urethane plastic foam) –  100 mm;

Vnet= 2,5 м3

Vtotal= 3,1 м3

2.4 Control panel for  Refrigeration compartment 1 Automatic control of the cold supply system, output and control on the head touch panel
3. Fermentation and after-fermentation part
3.1 Conical Tank: spiral cooling

system, thermo-insulation

 

12 Material: Steel AISI 304

Dimensions:  ∅2000х6600;

V tot. – 12 400l, V op. – 10 000l;

P operational = 1,5-2 atm

  • Rotary cleaning ball
  • Upper manhole
  • CIP DN 50
  • Cooling jacket (cone + 2 cylinders)
  • Bunging device
  • Temperature sensor -3pcs
  • Butterfly valves
  • Sampling valve
  • Flexible level indicator
3.2 Control panel FV

 

3 Semiautomated control, automated temperature control in fermentation tanks, temperature controller with

PID controller Autonics – 12 pcs,  solenoid-operated valve ODE – 13 pcs.

3.3 Beer piping system 2 Conical tanks coolant connection
4.  Ancillary Technological Equipment
4.1 Brewer set 1 Express analysis devices,

Scales, reagents, bucket, scraper,

Refractometer;  alcohol thermometer;  ladle,

Dropper (iodine), wrench,  scraper ;

Refractometer – 1 pc.; Alcohol thermometer – 1 pc.;

Dropper (iodine) – 1 pc.; Wrench,  scraper – 1 pc.

Sampling bucket – 1 pc.; Fitting for pumping wort DN25(32); Areometer  0-10%., Areometer 10-20% – 1 pc.

4.2 CIP- station 1 Material: Steel AISI 304

V=2*1m3

P=6.5 kW, 380V

Pump Calpeda MXH 804 Pump (Italy)

4.3 Pipelines for the transfer of wort from the brewing order to the CCT 1 P=6.5 kW, 380V

(specified by agreement with the client)

4.4 Installation set & Transporting constructions 1 Set of materials for transfer, installation and commissioning;

Fill out the form below and today we will provide you with the calculation results for your brewery.

*Select volume to see available options
*Depends on the brewing volume
*Depends on the brewing volume
You can select multiple options
*Depends on the brewing volume
*Depends on the brewing volume
Total: 0,00 €
Want to get an offer for this calculation? Fill the required fields.

Submit an application

Leave a request and we will contact you


Terms of delivery: EXW

Time of delivery: 90 days

Installation time: 30 days

Launch period, four brews and training of personnel: 10 days

 

INSTALLATION

Turn key installation (15 – 17% of the brewery price).

Installation is carried out by our company. All expenses are covered by the supplier. The final cost of installation may be calculated after receiving of detailed building plan and photo report (or after visit of our specialist to brewery installation site).

 

Simple Brew Company:

  • Reliable manufacturer of high quality brewing equipment;
  • Certificated materials of European manufacturers;
  • Full manual assembly, compulsory testing of equipment before shipment
  • Reasonable prices;
  • Individual approach to clients;
  • Experience over 16 years, 170 successfully completed projects around the World: Ukraine, Russia, CIS countries, European Union, North America, Asia.

 

Each brewery made by Simple Brew it’s a project designed according to your individual requirements and technical indicators. Buying a brewery you will get reliable equipment and additional services which allow you to launch a successful project even without brewing experience.

 

The process of cooperation:

  • Detailed calculation of a recoupment of your project;
  • Training of your personnel by our brewers;
  • Warranty and post-warranty service;
  • Recommendations about quality raw materials.

 

For more detailed information and miscalculation, please contact our specialist through the application form on the website 


Technical task application

Leave a request and we will contact you


Submit an application

Leave a request and we will contact you