The compact Brewhouse section consists of two universal apparatus: Mash preparation-Filtering tun (M-F) and Kettle-Whirlpool tun (K-W). Both devices are able for heating, which gives a wide range of opportunities for the implementation of creative ideas of brewers. Small dimensions and well-thought-out piping system of the “Simple Brew” breweries makes the workflow simple and convenient.
Leave a request and our responsible manager will contact you to discuss the cooperation possibilities.
The Brewhouse is designed as a North American wort preparation type, due to that, it is possible to produce the beverages with high density and products, which requires the use of a large amount of malt. Traditional mashing methods are available too – whether it is an “infusion” method or a method of “decoction”.
The vapor removal system (vapor condenser) will allow you to efficiently evaporate the wort and get rid of unwanted fumes.
The Simple Brew brewhouse allows to make up to 6 batches per day, which significantly affects the overall brewery performance. The piping is designed in such a way that minimizes the oxidation of the wort during its preparation, and the increased number of viewing diopters (both tube located directly in the piping and stationary, which are located directly in the apparatus) will allow you to qualitatively control the progress of all technological processes.
Such combination of brewing vessels allows to reduce the pressure on the wort, by reducing the number of transfers from one apparatus to another, as well as to have the possibility of starting the next batch right after removing the grains from the mash-filtration apparatus (M-F). In addition, the total time required for washing, disinfection, preparation for the next batch. The consumption of detergents and rinsing water is reduced too, which, accordingly, reflected in the profitability of the whole production.
№ | Component | Qty | Technical characteristics |
|
|||
1.1 | Mash tun/Lauter tank | 1 | Net capacity: 1000L, Gross capacity: 1500L
Stainless steel AISI 304 thickness:
Configuration:
|
1.2 | Kettle/ Whirlpool tank | 1 | Net capacity: 1000L, Gross capacity: 1500L
Stainless steel AISI 304 thickness:
Configuration:
|
1.3 | Steam generator | 1 | Р= 100 kg-steam/hour, Р=70 kW, 380 V |
1.4. | Hot water tank | 1 |
|
1.5 | Wort pump | 1 |
ABB motor |
1.6. | Work platform | 1 |
|
1.7. | Plate Heat
exchanger |
1 |
|
1.8. | PLC
controller |
1 |
|
1.9. | Hops filter | 1 |
|
1.10 | Wort oxygen device | 1 | Includes sight glass, Venturi, yeast adding tank, temperature gauge, Inflatable head and inflatable hose |
1.11 | Malt mill | 1 |
|
2. Compartment for fermentation and maturation | |||
2.1. | Cylindrical-conical
Tank 1000l – € 5500 2000l – € 7900 |
6 | Material: Steel AISI 304: Inner cone and head – 3 mm; Inner cylinder – 2 mm; V total=720l, V net=600l; H = 2650mm, d = 1260mm, P operational = 0.7-2 atm Thermal insulation (polyurethane foam) – 80 mm; Configuration:
|
2.2. | Cooling station | 1 |
|
3. Additional technological equipment | |||
3.1. | CIP (Disinfection Tank+ Alkali tank+ Cleaning Pump) | 1 |
Semi-open impeller |
3.2 | Set of installation materials | 1 |
|
3.3 | Brewer’s set | 1 |
|
Fill out the form below and today we will provide you with the calculation results for your brewery.
Submit an application
Leave a request and we will contact you
Brewery performance based on Cylindrical Conical Tanks (CCT)
Average production time:
- bright – 21 days;
- wheat – 24 days;
- dark – 30 days.
Percentage:
- bright – 60% * 21 days = 12.6 days;
- wheat – 20% * 24 days = 4.8 days;
- dark – 20% * 30 days = 6 days.
Cost of 1 CCT Vnet=2000l- 7900 Euro):
- 6 CCT * 2000l / 23.4days = 513l./day * 30 days = 15390 liters / month;
- 7 CKT * 2000l / 23.4days = 598l./day * 30 days = 17940 liters / month;
- 8 CKT * 2000l / 23.4days = 684l./day * 30 days = 20520 liters / month;
- 9 CKT * 2000l / 23.4days = 769l./day * 30 days = 23070 liters / month;
- 10 CKT * 2000l / 23.4days = 855l./day * 30 days = 25650 liters / month;
- 11 CKT * 2000l / 23.4days = 940l./day * 30 days = 28200l. / month;
- 12 CKT * 2000l / 23.4days = 1026l./day * 30 days = 30780l. / month.
For more detailed information and miscalculation, please contact our specialist through the application form on the website